Wish Pearl

10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine

Description: Hydro Generator 10000W Water Turbine Impulse Generator Pelton Wheel Power: 10000W Single phase: 220v Flow: 0.035m3/s Water head: 10-30m Speed: 500-1500 rpm Current: 45A Water pipe joint :90mm Dual-use hydroelectric, can impact water when the water generator to generate electricity, diesel or gasoline engine can be used to drive power if there is insufficient water supply. Designed for the manufacture of the seasonal depletion of regional water resources. Our professional and technical personnel to learn advanced experience, well-developed, according to remote areas, without the characteristics of different water conditions and electrical areas, local conditions to design a variety of sizes and types of permanent hydro products, is mountainous areas over the power supply apparatus lighting, audio, television, fans, and home appliance electricity. Products with small size, light weight, easy to install, reliable, high economic efficiency, durability and other characteristics. Selling the price of the product and not representing the level of product quality is good or bad, it also depends on the profit point the treasurer heart is. We mainly to the wholesale shop entity combining multiple sales channels, every day goods sent to the country so a lot of selling on price, so that some businesses the sales price to the customer than we actually price is even higher, please have the intention to buy customers to seriously consider selecting micro hydro plant is the right product only one aspect, purchase products on Taobao, your most important thing is to see how after-sales service. Factory direct is your good choice! Standalone detailed parameters Precautions: 1. Non-load power, if you do not need an electricity generator set valve switch is closed, stopping the impeller turn red generator, hydro prevents burning load. 2. Any power generator's real issue is the amount of eighty percent mark, real hair 1000W power is 800W, electrical starting power double refrigerator if you are 150W, 300W of power when you need to start. 3. electrical household appliances in principle, start big power, then start small power, super power can not run. Do not no-load operation Installation and operation instructions 1. Installation requirements: the bottom plane of the hydraulic turbine is closely contacted with the foundation plane without gaps, and the contact surface neither makes the tail water splash nor leaks outward. 2. Installation procedure: After the unit foundation with concrete is solidified, the unit shall be installed in place and then poured in sequence. When installing the unit, the levelness must be measured with a level ruler to ensure that the unit is fixed in a horizontal position. The gap between the unit and the ground shall be sealed with cement to prevent water seepage. After the installation of the unit, another inspection shall be carried out, and the runner shaft of the hydraulic turbine shall be rotated manually. If it moves flexibly, the installation of the unit shall be completed. 3. Basic requirements for pipe installation: pipes shall be purchased according to the pipe diameter required by the unit, and the drop height can reduce the pipe diameter. The pipeline shall be straight and the bending shall be minimized. The included angle between the pipeline and the horizontal shall not be less than 25 degrees. Otherwise, the pipeline will grow and the head loss will be large, which will lead to insufficient power generation and other consequences. The water inlet of the headrace pipe installed in the forebay wall is most likely to be a flared pipe. Its lower edge is not less than 0.2 meters from the pool bottom plane. The inner diameter of the joint shall be equal. In order to reduce the head loss, the joint shall be minimized. 4. Installation of steel pipes: most of the micro hydropower stations use steel pipes with flanges welded. During installation, the flange rubber pad must be placed correctly to avoid reducing the water passing section. The pipe joint nuts should be tightened gradually in diagonal order. 5. Anchor block: at the water diversion pipe joint and turbine nozzle, the pipe bears the maximum pressure, so a anchor block must be built with stone or concrete to fix the metal pipe. 6. Buttress: due to the weight of self weight and water, the metal pipe is easy to bend and deform if it is too long, so a buttress must be added in the middle. The location of the branch pipe should preferably be set at the joint of the pipe. Inspection after installation 1. Check the pipes and joints for leakage. If leakage is found, the causes shall be analyzed and handled in a timely manner. 2. The dirt blocking the pipeline left during installation shall be cleaned to ensure smooth water flow. 3. Check whether the pipe is bent or deformed and whether the support is firm after bearing the water pressure. In case of any abnormal phenomenon, it shall be handled in time. Installation of valves The valve is installed on the water intake pipe, and the end close to the unit is about 1 m away from the nozzle or directly installed on the nozzle, depending on the specific situation. The valve diameter of micro hydropower should be consistent with that of water pipe. Gate valve or ball valve can be selected, but stop valve must not be used, because the selection of stop valve will reduce the flow section and affect the turbine output. Two points must be paid attention to when installing the valve: 1. The centerline of turbine runner shaft and tailrace must be kept on the same plumb line. 2. The flange rubber gasket shall be properly padded and the bolt connection shall be fastened, so as to reduce the head loss and prevent leakage. computer room The machine room of the micro turbine unit can be built as a civil building, which shall ensure ventilation in the room and be free from water leakage and seepage. Its area depends on the size of the unit, and the distance from the unit to the wall shall not be less than 0.8m to facilitate installation, maintenance and operation. debugging Inspection before commissioning. After the installation of micro hydropower, it must be checked before the test run. The inspection includes the inspection of installation quality, micro water motor unit and electrical system. Inspection of installation quality 1. The water channel and headrace pipe shall be free of water leakage, the fence at the water inlet shall be free of debris, and the valve shall be flexible to open and close; 2. The water level of the ponding pond shall be kept to the design water level; 3. The drainage ditch shall be covered tightly; Inspection of micro water motor unit and electrical system 1. Open the control box cover of the generator and check whether the brush and slip ring are in good contact; 2. All mechanical connection fasteners shall be free from looseness; 3. The runner shall rotate flexibly without shaking or abnormal sound, and lubricating oil shall be added to all rotating parts. 4. The wiring of electrical appliances shall be reliable, and the total power load shall not exceed the rated generating power of the generator set. Units connected with electric regulators or equipped with mechanical voltage regulators may not be connected to the load temporarily, but the electric regulators must be firmly wired or the mechanical voltage regulators must be sensitive. Commissioning Slowly open the gate to drain water, the water flow will drive the runner to rotate, and the generator voltage will slowly rise to the rated voltage. Note: (Users who install valves must open the valve to the maximum position) If the maximum generating capacity exceeds 20% of the rated generating capacity of the unit, the water volume should be reduced and the maximum generating capacity should be adjusted to 105% of the rated generating capacity to prevent the unit from working under overload for a long time. If the generating capacity is less than the design capacity, check whether the submergence depth of the headrace of the forebay is sufficient, whether there are cyclones entering, whether the headrace is blocked, and whether the unit operates with jamming and friction, and try again after the problem is eliminated. parking Remove the load at each power end, open the switch, and then close the gate. The permanent magnet motor shall first close the water gate of the turbine and then open the electric switch

Price: 1999.99 USD

Location: Wuxi

End Time: 2024-10-03T01:43:49.000Z

Shipping Cost: 0 USD

Product Images

10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine10KW 220V Hydropower Generator Impulse Pelton Wheel Hydroelectric Water Turbine

Item Specifics

Restocking Fee: No

Return shipping will be paid by: Buyer

All returns accepted: Returns Accepted

Item must be returned within: 30 Days

Refund will be given as: Money back or replacement (buyer's choice)

Current Output: 40-49 A

System Configuration: Hybrid

Solar Technology: Do Not Apply

Power Source: Water

Wattage: 6000-9999 W

MPN: Do Not Apply

Current Type: AC

Voltage: 201-300 V

Axis Orientation: Horizontal

Features: All Daylight Conditions, Automatic Voltage Detection, Bluetooth Module, Brushless Motor, Corrosion Resistant, Daylight Operation, Fixed Guyed, Flexible, Foldable, Freestanding

Pliability: Rigid

Maximum Input Power: 10KW

Maximum Input Voltage: Greater Than 200 V

Color: Green

Current Rating: 41-50 A

Material: Stainless Steel

Brand: WEITER-ENERGY

Type: Pelton Turbine

Model: WT-CJS-10KW

Recommended Environment: Outdoor

Resistance Properties: Abrasion Resistant, Acid Resistant, Antimicrobial Resistant, Chemical Resistant, Childproof, Child Resistant, Corrosion Resistant, Dustproof, Dust Resistant, Fade Resistant

Charging Mode: MPPT (Maximum Power Point Tracking)

Country/Region of Manufacture: China

Application: Agriculture/Farming, Aquaculture, Back-up Power, Camping/Hiking, Irrigation, Municipal, Pool, Shed

Power: 10000W

Maximum Water Head: 30m

Recommended

WEITER DENKEN: VON DER ENERGIEWENDE ZUR By Dieter Flamig & De Lothar Maiziere
WEITER DENKEN: VON DER ENERGIEWENDE ZUR By Dieter Flamig & De Lothar Maiziere

$92.75

View Details
2000W Wind Turbine Grid Tie Inverter Pure Sine Wave 45-90V AC Output 110V/220VAC
2000W Wind Turbine Grid Tie Inverter Pure Sine Wave 45-90V AC Output 110V/220VAC

$389.99

View Details
Damit Die Lichter Weiter Brennen: F?R Eine Professionelle Energie- Und Verk...
Damit Die Lichter Weiter Brennen: F?R Eine Professionelle Energie- Und Verk...

$45.31

View Details
3000W Dual MPPT Wind Solar Hybrid Charge Controller Auto 12V 24V 48V Regulator
3000W Dual MPPT Wind Solar Hybrid Charge Controller Auto 12V 24V 48V Regulator

$249.99

View Details
2200W 220V Electric Corn Sheller Thresher Threshing Stripping Machine 2800rpm
2200W 220V Electric Corn Sheller Thresher Threshing Stripping Machine 2800rpm

$349.99

View Details
2200W Electric Corn Thresher Sheller Threshing Stripping Machine Shucker Remover
2200W Electric Corn Thresher Sheller Threshing Stripping Machine Shucker Remover

$349.99

View Details
10000W 3Blades Wind Turbine 120V 220V 380V On Grid 3-phase Wind Power Generator
10000W 3Blades Wind Turbine 120V 220V 380V On Grid 3-phase Wind Power Generator

$5199.99

View Details
Damit Die Lichter Weiter Brennen: F?R Eine Professionelle Energie- Und Verk...
Damit Die Lichter Weiter Brennen: F?R Eine Professionelle Energie- Und Verk...

$30.32

View Details
5000W 3Phase Permanent Magnet Generator Pure Copper Winding Alternator Electric
5000W 3Phase Permanent Magnet Generator Pure Copper Winding Alternator Electric

$799.99

View Details
1700W Electric Big Cattle Dehorner Adult Cow Horn Cutting Machine Saw Cutter220V
1700W Electric Big Cattle Dehorner Adult Cow Horn Cutting Machine Saw Cutter220V

$529.99

View Details